Construction Specifications Institute CDT Exam Overview:
| Certification Vendor: | Construction Specifications Institute (CSI) |
| Exam Name: | Construction Documents Technologist |
| Exam Number: | CDT |
| Exam Duration: | 150 minutes |
| Exam Format: | Multiple Choice |
| Real Exam Qty: | 120 |
| Available Languages: | English |
| Exam Price: | USD $285 - $520 |
| Certificate Validity Period: | 3 years |
| Related Certifications: | CCS - Certified Construction Specifier CCCA - Certified Construction Contract Administrator CCPR - Certified Construction Product Representative |
| Passing Score: | Scaled score determined by CSI |
| Sample Questions: | Construction Specifications Institute CDT Sample Questions |
| Exam Way: | Computer-based exam available at testing centers and online remote proctoring. |
| Pre Condition: | No formal prerequisite required. Recommended for professionals involved in construction documentation, project delivery, specifications, architecture, engineering, and contracting. |
| Official Syllabus URL: | https://www.csiresources.org/certification/cdt |
Construction Specifications Institute CDT Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Preconstruction | 9% | - Project Planning
|
| Topic 2: Fundamentals | 13% | - Construction Industry Basics
|
| Topic 3: Lifecycle Activities | 8% | - Facility Operations
|
| Topic 4: Construction | 15% | - Construction Administration
|
| Topic 5: Construction Documents | 22% | - Documentation and Specifications
|
| Topic 6: Project Concept and Delivery | 11% | - Project Delivery Methods
|
| Topic 7: Procurement | 10% | - Bidding and Negotiation
|
| Topic 8: Design Process | 12% | - Design Development
|
Construction Specifications Institute Construction Documents Technologist Sample Questions:
1. The architect/engineer reviews submittals for which of the following reasons?
A) To correct or change the design
B) To monitor design conformance
C) To review substitution requests
D) To review installation procedures
2. Lump sum, unit price, and cost-plus-fee are examples of what?
A) Delivery method
B) Bonding system
C) Basis of payment
D) Cost estimate
3. What project scheduling technique involves setting the target date of building occupancy and then working backwards to establish preceding milestone dates?
A) Front end loading
B) Schedule of values
C) Methods technique
D) Critical path method
4. Standards for sustainable facilities, products, and fundamental approaches emphasize the needs of what?
A) Owner team, contractor team, and design team
B) Public, private, and environmental health
C) Architect, supplier, and contractor
D) Owner, stakeholders, and participants
5. Which meeting is held for the purposes of introducing the design and construction teams, establishing the ground rules for communication, and explaining the administrative process?
A) Prebid meeting
B) Coordination meeting
C) Mobilization meeting
D) Preconstruction meeting
Solutions:
| Question # 1 Answer: B | Question # 2 Answer: C | Question # 3 Answer: D | Question # 4 Answer: B | Question # 5 Answer: D |