AEE CEM Exam Overview:
| Certification Vendor: | Association of Energy Engineers (AEE) |
|---|---|
| Exam Name: | Certified Energy Manager Examination |
| Exam Number: | CEM |
| Passing Score: | 700 (scaled 0–1040, approx. 70%) |
| Certificate Validity Period: | 3 years |
| Exam Format: | Scenario-based, Multiple-choice, Calculation questions, Open-book |
| Available Languages: | English |
| Exam Price: | $500 – $625 USD |
| Exam Duration: | 240 minutes |
| Related Certifications: | Certified Measurement & Verification Professional (CMVP) Certified Energy Auditor (CEA) Energy Manager In-Training (EMIT) |
| Real Exam Qty: | 130 (120 scored, 10 unscored pretest) |
| Recommended Training: | AEE Official CEM Training |
| Exam Registration: | Official Registration |
| Sample Questions: | AEE CEM Sample Questions |
| Exam Way: | Computer-based testing at Prometric centers; online proctored option available |
| Pre Condition: | Meet education + work experience requirements; complete approved preparatory training; submit application and verification documents |
| Official Syllabus URL: | https://www.aeecenter.org/certified-energy-manager/ |
AEE CEM Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Boiler and Steam Systems | 4–6 | - Operation and efficiency - Maintenance and optimization |
| Operations, Maintenance and Commissioning | 5% | - Maintenance best practices - Commissioning and retro-commissioning |
| Building Automation and Controls | 5% | - Building management systems - Control systems and strategies - Automation and optimization |
| Measurement and Verification | 5% | - Baseline development and savings calculation - M&V protocols and standards |
| Distributed Generation and Renewable Energy | 4–6 | - Combined heat and power (CHP) - Grid integration and economics - Solar, wind, biomass, geothermal |
| Lighting Systems | 10% | - Lighting technologies and efficiency - Design and control strategies - Daylighting integration |
| Energy Audits and Instrumentation | 10% | - Data collection and analysis - Audit levels and methodologies - Measurement tools and instrumentation - Energy performance indicators |
| Electrical Power Systems and Motors | 15% | - Power factor correction and load management - Power distribution and quality - Motor systems, efficiency and controls |
| HVAC Systems and Building Envelope | 15% | - Heating, ventilation and air conditioning - Load calculation and system selection - Thermal envelope performance |
| Energy Savings Performance Contracting | 5% | - Guaranteed savings and risk allocation - Contract structures and financing |
| Energy Storage Systems | 3–5 | - Storage technologies and applications - Integration and benefits |
| Codes, Standards and Regulations | 5% | - Sustainability policies and frameworks - Compliance and reporting requirements - Energy efficiency codes and standards |
| Industrial Systems | 6–8 | - Compressed air, pumping, and drying systems - Process energy efficiency |
| Energy Accounting and Economics | 15% | - Life cycle costing and economic analysis - Utility rate structures and tariffs - Time value of money, NPV, IRR, payback analysis - Energy units and conversions |
AEE Certified Energy Manager (CEM) Sample Questions:
What is the purpose of monitoring energy consumption?
SELECT THE CORRECT ANSWER
- A. All of the above
- B. To establish when and why there is a deviation in energy consumption patterns
- C. To establish a basis of management control
- D. To support analysis of energy information
Correct Answer: A 🗳️
Explanation: Only visible for TopExamCollection members. You can sign-up / login (it's free).
Which of the following best describes a thermally-light building?
- A. An underground storage facility
- B. A single-story office building where the load on the heating and cooling system is proportional to the outside air (ambient) temperature
- C. A computer data center housing multiple internet server racks
- D. A building filled with manufacturing and process equipment
Correct Answer: B 🗳️
What type of passive heat exchanger can wrap around an evaporator coil to precool entering air and reheat the air after the cooling coil without adding more moisture to the supply air stream?
- A. Plate and frame
- B. Desiccant heat wheel
- C. Run-around coil
- D. Heat pipe
- E. Heat pump
Correct Answer: D 🗳️
A building is conditioned by an air-conditioning and heating system. What technology can directly prevent simultaneous heating and cooling of the space?
- A. Setback thermostat
- B. Air handling unit
- C. Indoor air quality sensors
- D. Derivative control
- E. Variable air volume control
Correct Answer: E 🗳️
You are using a performance contract to finance the added cost of using more-efficient equipment in the construction of a new building. Which of the following International Performance Measurement and Verification Protocol (IPMVP) options would you use to verify annual energy savings?
- A. Option D - Calibrated simulation
- B. Option A - Retrofit isolation: key parameter measurement
- C. Option B - Retrofit isolation: all parameter measurement
- D. Option C - Whole facility measurement
- E. Option E - Stipulated savings
Correct Answer: D 🗳️

We're so confident of our products that we provide no hassle product exchange.