EMC Dell PowerEdge MX Modular Deploy 2023 Sample Questions:
1. During the installation of a PowerEdge MX7000, the implementation engineer notices the PSU health indicator stay on for one second, blink five times, then shut off.
What is the issue?
A) The PSU is faulty.
B) The PSU is performing firmware updates.
C) There is a PSU mismatch.
D) There is no power to the PSU.
2. How are double-width compute sleds on the MX7000 numbered from the front?
A) From 1 to 8, left to right
B) From 1 to 8, top to bottom
C) As 1, 3, 5, and 7, top to bottom
D) As 1, 3, 5, and 7 left to right
3. What is the port configuration of an MX5108n switch?
A) 16 x internal 25GbE ports
1 x 40GbE QSFP+ port
2 x 100GbE QSFP28 ports
4 x 10GbE RJ45 Base-T ports
B) 8 x internal 25GbE ports
1 x 40GbE QSFP+ port
2 x 100GbE QSFP28 ports
4 x 10GbE RJ45 Base-T ports
C) 16 x internal 25GbE ports
4 x 40GbE QSFP+ ports
2 x 100GbE QSFP28 ports
1 x 10GbE RJ45 Base-T port
D) 8 x internal 25GbE ports
2 x 40GbE QSFP+ ports
1 x 100GbE QSFP28 port
4 x 10GbE RJ45 Base-T ports
4. Which micro controller-based module allows the Management Module to communicate with all the hardware present in a PowerEdge MX7000 chassis?
A) iDRAC
B) EC
C) iSM
D) FReD
5. Which VLAN is reserved for internal switch communication?
A) 1
B) 3939
C) 4021
D) 4001
Solutions:
| Question # 1 Answer: C | Question # 2 Answer: D | Question # 3 Answer: B | Question # 4 Answer: D | Question # 5 Answer: D |