BICSI DCDC-004.1 Exam Overview:
| Certification Vendor: | BICSI (Building Industry Consulting Service International) |
|---|---|
| Exam Name: | BICSI Data Center Design Consultant (DCDC) |
| Exam Number: | DCDC-004.1 |
| Real Exam Qty: | 100 |
| Passing Score: | Not publicly disclosed as a fixed percentage; determined through a standard-setting study |
| Related Certifications: | BICSI Outside Plant Designer (OSP) Registered Communications Distribution Designer (RCDD) Registered Telecommunications Project Manager (RTPM) BICSI Technician (TECH) |
| Available Languages: | English |
| Exam Duration: | 120 minutes |
| Exam Price: | USD 510 (BICSI members); USD 725 (nonmembers), including the first exam attempt |
| Certificate Validity Period: | Three-year certification cycle; 36 continuing education credits (CECs), including at least one BICSI Ethics Course, are required for recertification |
| Exam Format: | Multiple choice, Hot-spot identification, Drag-and-drop, Computer-based examination, Multiple-response questions with two correct answers |
| Exam Way: | Computer-based testing through Pearson Professional Assessments at a testing center in its global network. Candidates must submit a BICSI application and receive eligibility approval before scheduling. |
| Pre Condition: | Candidates must qualify through one of three pathways: hold a current RCDD certification; have two years of verifiable full-time-equivalent experience in data center design, construction, and/or operations plus a current BICSI TECH, RTPM, or OSP certification, or a degree in architecture, engineering, or construction management; or have three years of verifiable full-time-equivalent experience in data center design, construction, and/or operations within the past seven years. |
| Official Syllabus URL: | https://www.bicsi.org/certifications/certification-types/data-center-design-consultant-dcdc |
BICSI DCDC-004.1 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Construction Administration and Commissioning | 10% | - Commissioning test execution and results verification - Construction administration and project coordination - Design intent verification and quality assurance - Pre-commissioning planning and commissioning activities |
| Concept Planning and Analysis | 30% | - Client needs assessment and data center model selection - Project planning, ownership models, and facility capacity strategies - Site evaluation and selection - Availability requirements and risk assessment - Feasibility analysis and budgeting |
| Systems: Information Technology, Ancillary Systems, Communications Connectivity | 20% | - Information Technology (Network, Storage, and Servers)
|
| Security Assessment | 10% | - Physical security requirements and threat assessment - Security audits and risk mitigation - Disaster recovery and business continuity requirements |
| Data Center Operations and Maintenance Assessment | 10% | - Operational management, documentation, and maintenance procedures - Availability, capacity, and operational performance considerations - Assessment of operations and maintenance practices |
| Systems: Architectural and Space Design, Mechanical, Electrical | 20% | - Mechanical Systems
|