BICSI Installer 2 - Copper Sample Questions:
1. In BICSI best practices, grounding and bonding busbars within a telecommunications space should:
A) Be listed (UL or other) and installed on insulated standoffs
B) Be sized according to the largest building ground conductor
C) Use aluminum busbars exclusively
D) Always be placed above electrical panels for easy access
2. A building with multiple Telecommunications Rooms (TRs) on the same floor is recommended when:
A) The building has fewer than 100 occupant work areas
B) Each TR can serve a horizontal cable distance of 100 m (328 ft) or less
C) Reducing electromagnetic interference is the primary concern
D) The TRs are directly adjacent to each elevator shaft
3. Which of the following is used to establish a 0 volt (V) reference for ac electrical power systems?
A) Equipment grounding system
B) Alternating current (AC) grounding electrode system
C) Telecommunication bonding infrastructure
4. Which of the following refers to a set of rules issued by a governmental body at the state level within the US?
A) Regulations
B) Applications
C) Guidelines
D) Best Practices
5. Which type of cabling is installed between a main cross-connect (campus distributor) and an intermediate cross-connect (building distributor)?
A) Second-level backbone
B) First-level backbone
C) Horizontal
Solutions:
| Question # 1 Answer: A | Question # 2 Answer: B | Question # 3 Answer: B | Question # 4 Answer: A | Question # 5 Answer: B |

We're so confident of our products that we provide no hassle product exchange.


By Scott


