Tibco TCA-Tibco-BusinessWorks Exam Overview:
| Certification Vendor: | TIBCO |
| Exam Name: | TIBCO BusinessWorks Certified Associate Exam |
| Exam Number: | TCA-TIBCO-BusinessWorks |
| Available Languages: | English |
| Related Certifications: | TIBCO BusinessWorks Certified Professional |
| Exam Format: | Multiple Choice, Scenario-based Questions |
| Recommended Training: | TIBCO BusinessWorks Training Courses |
| Exam Registration: | TIBCO Certification Portal |
| Sample Questions: | Tibco TCA-Tibco-BusinessWorks Sample Questions |
| Exam Way: | Online proctored or authorized testing center (varies by region) |
| Pre Condition: | Basic understanding of integration concepts and TIBCO BusinessWorks Studio recommended |
| Official Syllabus URL: | https://www.tibco.com/services/education/certification |
Tibco TCA-Tibco-BusinessWorks Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| TIBCO BusinessWorks Fundamentals | - Architecture and components overview - Project structure and development lifecycle |
| Error Handling and Debugging | - Exception handling strategies - Debugging processes in BusinessWorks Studio |
| Integration and Adapters | - Adapter configuration and usage - SOAP/REST web services integration |
| Deployment and Administration | - Runtime configuration and monitoring - Application deployment concepts |
| Process Design and Development | - Process design using BusinessWorks Studio - Data transformation and mapping - Activities, transitions, and process flow control |
Tibco TIBCO BusinessWorks Certified Associates Sample Questions:
1. The TIBCO ActiveMatrix BusinessWorks architect requests the application developer to design applications that allow for high availability.
Which three configuration properties should be set so that managed fault tolerance is implemented? (Choose three.)
A) bw.engine.persistenceMode=group
B) bw.engine.persistenceMode=datastore
C) a minimum of two AppNodes in an AppSpace
D) Process Activation in BusinessStudio
E) Process Mode in BusinessStudio
F) a minimum of two AppNodes across two AppSpaces
2. Which type of activity is required to implement an asynchronous event in a running process and then proceed with executing the process instance when an appropriate event is received?
A) Regular activity
B) Process Starter activity
C) Catch and Rethrow activity
D) Signal-in activity
3. Select 3 architectural elements that are included in REST services. (Choose three.)
A) Data elements
B) Resource metadata
C) Resource identifier
D) Applications
4. You are defining a process that uses a JMS Send Message activity to send a message to a backend application.
This application replies asynchronously and does not maintain the order of messages.
Which activity should you use if you need to correlate the replies from this application back in your original process?
A) JMS Receive Message
B) JMS Request Reply
C) Wait for JMS Request
D) Get JMS Queue Message
5. You need to synchronize multiple Critical Section groups that can be part of different process instances.
What should you do to accomplish this goal?
A) Increase the Timeout of the Critical Section to allow for all the different process instances to synchronize.
B) Create a Shared Lock in your Critical Section with a Module Shared Variable as Shared Variable Type.
C) Change the Group Type from Critical Section to Local Transaction.
D) Create a Shared Lock in your Critical Section with a Job Shared Variable as Shared Variable Type.
Solutions:
| Question # 1 Answer: A,C,E | Question # 2 Answer: D | Question # 3 Answer: A,B,C | Question # 4 Answer: A | Question # 5 Answer: B |

We're so confident of our products that we provide no hassle product exchange.


By Una


