
[Dec-2024] Check your preparation for SAP C_S43_2023 On-Demand Exam
Practice Exam C_S43_2023 Realistic Dumps Verified Questions
NEW QUESTION # 31
What are valid item categories for a BOM used in Asset Management? Note: There are 3 correct answers to this question.
- A. L (Stock item)
- B. E (Equipment)
- C. F (Functional location)
- D. D (Document item)
- E. I (PM Structure element)
Answer: A,D,E
Explanation:
Technical Objects
NEW QUESTION # 32
What is a characteristic of the SAP Fiori tile group? Note: There are 2 correct answers to this question.
- A. It is based on an SAP Fiori tile catalog.
- B. It is assigned via a portal role.
- C. It provides only HTML5-based apps.
- D. It can be assigned directly to the user via personalization.
Answer: A,D
Explanation:
User Interface and Mobile Maintenance
NEW QUESTION # 33
You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents.
What do you need to do?
Note: There are 2 correct answers to this question.
- A. Assign an inspection lot to the task list header.
- B. Assign a measuring point as a production resources/tools (PRT) to a task list operation.
- C. Assign a piece of equipment with an allocated measuring point to a task list operation.
- D. Assign an inspection document as a PRT to the task list operation.
Answer: B,C
Explanation:
Preventive Maintenance
NEW QUESTION # 34
You schedule a Maintenance Service Plan. Which call object is generated?
- A. Customer Service Order with assigned DIP profile
- B. Maintenance Order which is linked to a Service Order Header
- C. Customer Service Order with an external order operation
- D. Maintenance Order which is linked to a Service Order Item
Answer: D
Explanation:
A Maintenance Service Plan is a type of Maintenance Plan that is used to schedule periodic services for external customers. When a Maintenance Service Plan is scheduled, a Maintenance Service Call is generated, which contains a Customer Service Order Header and a Maintenance Order. The Maintenance Order is linked to a Service Order Item, which represents the serviceable material or asset. The Maintenance Order contains the technical details of the service, such as operations, components, and confirmations. The Service Order Item contains the commercial details of the service, such as pricing, billing, and credit check. The Maintenance Order and the Service Order Item are integrated through the Dynamic Item Processor (DIP), which transfers the costs and revenues between them. References: Maintenance Service Plan and Maintenance Service Order in SAP Help Portal.
NEW QUESTION # 35
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question.
- A. Factory calendar
- B. Scheduling indicator
- C. Start date
- D. Scheduling period
Answer: C,D
NEW QUESTION # 36
What do you have to consider when planning maintenance work that is to be carried out by an external company?
- A. In the control key assigned to the order operation, the "Service" indicator must always be activated.
- B. For the maintenance order type, you have to assign the Enhanced Procurement Mode.
- C. If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet.
- D. If you assign a control key for an external order operation, the actual values must always be entered as a goods receipt in the system.
Answer: B,C
Explanation:
When planning maintenance work that is to be carried out by an external company, you have to consider the following aspects:
* If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet. This is because the service entry sheet is used to record the services performed by the external company and to verify the invoice. The service entry sheet is linked to the purchase order and the maintenance order operation.
* For the maintenance order type, you have to assign the Enhanced Procurement Mode. This is because the Enhanced Procurement Mode enables you to use lean services and enhanced limits for external services. Lean services are intended for the procurement of small or highly specialized services that are carried out by external suppliers as part of an internal or external operation. They can be maintained in the material master as service products. Enhanced limits allow you to define a maximum amount for the external service without specifying the service specifications in advance.
* If you assign a control key for an external order operation, the actual values must always be entered as a goods receipt in the system. This is not true, because the goods receipt is only required for external materials, not for external services. For external services, the service entry sheet is used instead.
* In the control key assigned to the order operation, the "Service" indicator must always be activated.
This is not true, because the "Service" indicator is only required for external services, not for external operations. For external operations, the "External Processing" indicator must be activated instead. References: External Services Management (MM-SRV) | SAP Help Portal, Highlights for Asset Management in SAP S/4HANA 2021 | SAP Blogs.
NEW QUESTION # 37
You need to create a new functional location. Which actions can you perform with the SAP Fiori app "Create Technical Object"? Note: There are 3 correct answers to this question
- A. Assign documents
- B. Assign a subordinate piece of equipment.
- C. Create a task list for functional location
- D. Change a reference location.
- E. Edit classification data and characteristics.
Answer: A,D,E
Explanation:
The SAP Fiori app "Create Technical Object" allows you to create a new functional location and perform the following actions:
* Edit classification data and characteristics. You can assign a class to the functional location and enter values for the characteristics of the class. This helps you to categorize and search for functional locations based on their attributes1
* Assign documents. You can attach documents to the functional location, such as drawings, manuals, or certificates. This helps you to provide additional information and documentation for the functional location1
* Assign a subordinate piece of equipment. You can assign an existing piece of equipment as a subordinate object to the functional location. This helps you to establish a hierarchical structure of technical objects and show the relationship between them1 The SAP Fiori app "Create Technical Object" does not allow you to perform the following actions:
* Create a task list for functional location. You cannot create a task list for the functional location using this app. You need to use a different app, such as "Manage Task Lists", to create and maintain task lists for technical objects2
* Change a reference location. You cannot change the reference location of the functional location using this app. You need to use a different app, such as "Change Functional Location", to modify the reference location of an existing functional location3 References: 1: Create Technical Object | SAP Help Portal 2: [Manage Task Lists | SAP Help Portal] 3:
[Change Functional Location | SAP Help Portal]
NEW QUESTION # 38
A Task List contains two operations:
*Every 3 MON: pump inspection
*Every 24 MON. pump replacement
When replacing the pump, the operation pump inspection will be ignored. How can you achieve this?
- A. Assign different hierarchy levels
- B. Create a task list hierarchy
- C. Set the lead float
- D. Create a cycle set sequence
Answer: D
Explanation:
A cycle set sequence is a feature that allows you to combine several multiple counter plan cycles in a set and determine the order in which the system considers the cycle sets for scheduling. A multiple counter plan is a maintenance plan that is based on one or more performance-based or time-based cycles1.
In this case, you can create a cycle set sequence with two cycles:
* Cycle 1: Every 3 MON: pump inspection
* Cycle 2: Every 24 MON: pump replacement
You can assign a different maintenance item and task list to each cycle, and specify the repetition factor for each cycle. The repetition factor determines how many times the cycle is repeated before the next cycle in the sequence is considered. For example, if you set the repetition factor of cycle 1 to 8, the system will schedule the pump inspection 8 times before scheduling the pump replacement.
By creating a cycle set sequence, you can achieve the requirement that when replacing the pump, the operation pump inspection will be ignored. The system will only generate a call object for the maintenance item that is assigned to the current cycle set. Therefore, when the pump replacement is due, the system will not generate a call object for the pump inspection.
The other options are incorrect because:
* Assign different hierarchy levels: Hierarchy levels are used to structure the task list operations into groups and subgroups. They do not affect the scheduling of the task list operations.
* Set the lead float: Lead float is a time buffer that is added to the start or finish date of a task list operation. It does not affect the scheduling of the task list operations.
* Create a task list hierarchy: A task list hierarchy is a structure that contains several task lists that are linked together by a superior task list. It does not affect the scheduling of the task list operations.
References: 1: Cycle Set Sequence in Multiple Counter Plan - SAP Help Portal
NEW QUESTION # 39
You want to create a maintenance order with an external order operation that includes service items.
How can you achieve this? Note: There are 2 correct answers to this question
- A. The usage of a model service specification is mandatory.
- B. The actual value entry can be recorded only via the service entry sheet
- C. The assignment of a control key with key externally processed operation is sufficient.
- D. The assignment of a control key with the service indicator set is mandatory
Answer: B,C
NEW QUESTION # 40
How is Phase-based Maintenance Processing activated in the SAP system?
Note: There are 2 correct answers to this question.
- A. Through Best Practices scope items 4HH and 4HI.
- B. Phase-based maintenance is always active in all S/4HANA 2021 editions and above.
- C. By manually activating the corresponding Business Feature in case Best Practices are not used.
- D. By installing the corresponding enhancement pack and activating the related business function.
Answer: A,B
Explanation:
Maintenance Processing - Advanced Functions
NEW QUESTION # 41
Which settings must be customized to set up Inspection Checklist processing? Note: There are 2 correct answers to this question
- A. Maintain settings at plant level for usage decisions.
- B. Assign an Inspection Type to a Maintenance Order Type and a Planning Plant
- C. Create a control key which expects inspection characteristic assignments
- D. Assign an Inspection Type to a Maintenance Order Type.
Answer: A,B
NEW QUESTION # 42
What happens if you change the primary key of a functional location?
- A. The user must define a new labelling system for the new primary key.
- B. Changing the superior functional location via alternative labeling is not possible.
- C. The functional location cannot be assigned to a new superior functional location when the new label is entered.
- D. The user must decide whether the functional location is assigned to a new superior functional location.
Answer: C
Explanation:
Technical Objects
NEW QUESTION # 43
You want to have several plan dates calculated in a maintenance plan.Which scheduling parameter do you use?
- A. Scheduling indicator
- B. Call horizon
- C. Scheduling period
- D. End Date for Scheduling
Answer: C
Explanation:
To have several plan dates calculated in a maintenance plan, you use the scheduling period parameter. The scheduling period defines the time interval for which the system calculates the planned dates for the maintenance plan. For example, if you enter 12 months as the scheduling period, the system calculates the planned dates for the next 12 months from the current date. You can also specify the end date for scheduling, which is the last date for which the system calculates the planned dates. The scheduling indicator determines how the system calculates the planned dates based on the cycle, the shift factor, and the tolerance. The call horizon defines the percentage of the cycle that must be expired before the system generates a call object (such as a maintenance order or notification) for the planned date.
References: 1: Scheduling Maintenance Plans - SAP Learning 2: Maintenance Plan Scheduling Parameters - SAP Online Help
NEW QUESTION # 44
Which views can you assign to an equipment category via a view profile?
Note: There are 2 correct answers to this question.
- A. Serial data
- B. Manufacturer data
- C. Configuration
- D. Warranty
Answer: B,D
Explanation:
Technical Objects
NEW QUESTION # 45
Which functions characterize a Strategic analysis as opposed to Embedded analysis within the SAP S/4HANA core system?
Note: There are 2 correct answers to this question.
- A. SAP BusinessObjects as a part of SAP Business Warehouse (BW)
- B. A collection of tools that are not included with core SAP S/4HANA
- C. Preconfigured Core Data Service (CDS) containing SQL views
- D. SAP BusinessObjects Business Intelligence for Visualization
Answer: A,C
Explanation:
Maintenance Processing - Basic Functions
NEW QUESTION # 46
You need to create a new functional location.
Which actions can you perform with the SAP Fiori app "Create Technical Object"? Note: There are 3 correct answers to this question.
- A. Assign documents.
- B. Assign a subordinate piece of equipment.
- C. Change a reference location.
- D. Create a task list for functional location.
- E. Edit classification data and characteristics.
Answer: A,C,E
Explanation:
Technical Objects
NEW QUESTION # 47
Which of the following is a prerequisite for external refurbishment?
- A. Define the order type for external refurbishment.
- B. Select the material group for externally refurbished materials.
- C. Activate the subcontracting indicator in an external activity.
- D. Assign an external work center to a maintenance order operation
Answer: C
Explanation:
External refurbishment is the process of sending defective or worn-out spare parts to an external vendor for repair or replacement. To carry out this process, you need to create a maintenance order with an external operation that has the subcontracting indicator activated. This indicator allows you to create a purchase requisition and a purchase order for the external service. The external operation also requires an external work center, a control key, and a material component with the valuation type of the defective part. The order type for external refurbishment is not a prerequisite, but a configuration option that can be used to differentiate the process from internal refurbishment. The material group for externally refurbished materials is not relevant for the process, as the material master data is not changed by the refurbishment. The assignment of an external work center to a maintenance order operation is necessary, but not sufficient, for external refurbishment. You also need to activate the subcontracting indicator in the external activity. References:
* Explaining Refurbishment of Spare Parts, section "Refurbishing Spare Parts Externally"
* Refurbishment of Repairable Spares: Integration between SAP-PM and SAP-MM, section "4.2 External Refurbishment: Major Steps"
NEW QUESTION # 48
Which functions characterize a Strategic analysis as opposed to embedded analysis within the SAP S/4HANA core system? Note: There are 2 correct answers to this question
- A. SAP Business Objects Business Intelligence for Visualization
- B. SAP Business Objects as a part of SAP Business Warehouse (BW)
- C. Preconfigured Core Data Service (CDS) containing SQL views
- D. A collection of tools that are not included with core SAP S/4HANA
Answer: A,D
Explanation:
Strategic analysis is a type of analysis that provides a high-level overview of the business performance and trends, as well as the ability to drill down into the details and perform root cause analysis. Strategic analysis is typically performed by business analysts or managers who need to make strategic decisions based on the data.
Strategic analysis requires a collection of tools that are not included with core SAP S/4HANA, such as SAP Analytics Cloud, SAP Business Planning and Consolidation, SAP Business Warehouse, and SAP Business Objects Business Intelligence. These tools enable the integration, transformation, modeling, and visualization of data from various sources, including SAP S/4HANA and other systems. Embedded analysis, on the other hand, is a type of analysis that provides real-time insights into the operational data within the SAP S/4HANA core system. Embedded analysis is typically performed by end users or operational managers who need to monitor and optimize the business processes and transactions. Embedded analysis relies on preconfigured Core Data Services (CDS) views that contain SQL views of the data in SAP S/4HANA. These views can be accessed by SAP Fiori apps, SAP Smart Business KPIs, or SAP Analysis for Microsoft Office. SAP Business Objects is not a part of SAP Business Warehouse, but a separate product that can connect to SAP Business Warehouse or other data sources. Therefore, option C is incorrect. References:
* SAP S/4HANA Asset Management - Analytics, section "Strategic Analysis"
* SAP S/4HANA Asset Management - Analytics, section "Embedded Analysis"
* SAP S/4HANA Asset Management - Analytics, section "SAP BusinessObjects Business Intelligence"
NEW QUESTION # 49
Which of the following API types does SAP recommend to use to achieve clean core integrations? Note:
There are 2 correct answers to this question.
- A. OData
- B. RFC
- C. IDoc
- D. SOAP
Answer: A,D
Explanation:
Managing Clean Core
NEW QUESTION # 50
You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents. What do you need to do? Note: There are 2 correct answers to this question
- A. Assign an inspection lot to the task list header
- B. Assign a piece of equipment with an allocated measuring point to a task list operation
- C. Assign a measuring point as a production resources/tools (PRT) to a task list operation.
- D. Assign an inspection document as a PRT to the task list operation.
Answer: B,C
Explanation:
To set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents, you need to do the following steps:
* Assign a piece of equipment with an allocated measuring point to a task list operation. This will allow you to inspect the equipment and record the measurement readings for the measuring point during the inspection round. You can assign the equipment either manually or automatically using the object list in the task list header1.
* Assign a measuring point as a production resources/tools (PRT) to a task list operation. This will allow you to inspect the measuring point and record the measurement readings for it during the inspection round. You can assign the measuring point either manually or automatically using the PRT category
0010 (Measuring Point) in the task list operation1.
* You do not need to assign an inspection lot to the task list header, as this is not required for inspection rounds. Inspection lots are used for quality inspections that are triggered by events such as goods receipt, production order, or sales order2.
* You do not need to assign an inspection document as a PRT to the task list operation, as this is not supported for inspection rounds. Inspection documents are used for quality inspections that are based on inspection plans and inspection characteristics2. References: PM - General maintenance task list and Set up your SAP S/4HANA system for EAM Inspection Checklists in SAP Help Portal.
NEW QUESTION # 51
The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100% which date is relevant for the calculation of future planned dates if the maintenance work is delayed?
- A. Planned date of the next call, independent of maintenance order dates
- B. The date of the final confirmation
- C. Technical completion date of the maintenance order
- D. Actual finish date of the maintenance order
Answer: C
NEW QUESTION # 52
......
SAP C_S43_2023 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
Valid C_S43_2023 Dumps for Helping Passing SAP Exam: https://examcompass.topexamcollection.com/C_S43_2023-vce-collection.html

